More Focus – Page 73
-
Features
Offsite: quantifying the benefits
With all the talk about offsite construction and the savings it can offer, how in practice does a project team actually realise these benefits? Gavin White and Andrew Mather of Ramboll look at the data
-
Features
Grenfell and cladding: double indemnity
The construction industry has a huge task ahead to re-clad high-rise buildings. But restrictions to insurance cover is causing a shortage of companies willing to take on the work
-
Features
Projects: Grange Primary School, London - top of the class
Maccreanor Lavington has given a tired Victorian school a public face and facilities suitable for modern teaching method, without compromising its original character or surroundings
-
Features
Ð԰ɵç̨ Your Future: The future of consultants
Artificial intelligence is set to play a major part in construction. Where does that leave the humans who work in the sector?
-
Features
Regulations: issues of control
Construction failings at Grenfell Tower have highlighted the need for an overhaul of building control to ensure inspectors pick up on breaches of the Ð԰ɵç̨ Regulations, but how should this be done?
-
Features
Bring on the robots: the world's first 3D-printed house
It may still be sci-fi for some, but 3D printing is fast breaking down conventional barriers in engineering and architecture and changing the way the construction industry operates
-
Features
Tracker: March 2018
Activity is still rising, although more slowly in some sectors, while orders and enquiries are also on the up – although repair and maintenance is losing momentum
-
Features
Team builder: Flan McNamara talks to Ð԰ɵç̨
Flan McNamara found himself overseeing the creation of the capital’s tallest tower. But it’s all down to the team, not him
-
Features
Local elections: could Labour force a shift in housing and planning policy?
The party’s push to the left could change housing and planning policy – but are the plans as radical as they sound?
-
Features
Projects: Villages Nature Paris - tourism au naturel
With its power coming from geothermal energy and its buildings being ecologically sound, could a French water park, nestled next to Disneyland Paris, lead the way in sustainable mass tourism?Â
-
Features
Lead times: January-March 2018
In this quarter, three packages report a shortening of lead times – reflecting the beginning of a decline in enquiries
-
Features
Are late payment practices in construction too much for suppliers to bear?
Carillion’s collapse has exposed the harsh realities of construction’s late payment practices for suppliers. But now at last there are signs that the government and industry bodies are determined to crack down – the only question is: how far will they go?
-
Features
Ð԰ɵç̨ survey - gender pay gap
Earlier this month, Ð԰ɵç̨ conducted a snapshot survey to gauge the views of its readers on gender pay gap reporting within their organisations, as well as across the sector. Here, we share some of the survey’s findings, including some of the differences between male and female respondents.
-
Features
Procurement update: revolution
Two decades on from the Egan report and with a construction sector deal on the way, will 2018 be the year for construction’s procurement revolution?Â
-
Features
Gender pay gap: outnumbered
The UK’s gender pay gap results are out and guess which sector performed worst? You got it – construction. Jamie Harris and Chloë McCulloch look at what the figures really mean, what people in the industry think about the results and how the gap can be closed
-
Features
Inside the machine: the influence of high-tech architecture
Ike Ijeh explores the origins, impact and legacy of one of architecture’s most enduring concepts, as we begin a series reflecting on architectural styles through the ages
-
Features
Results season: Carillion has left a large hole in the market
It’s results season again, but with a difference: no Carillion. The demise of one of construction’s biggest players has cast a shadow over the field
-
Features
Into the unknown: a housebuilding journey
Every great housebuilding era in the last 175 years has featured in our pages. Here, Joey Gardiner asks if the next 25 years will witness a radical rethink in order to hit the ambitious goal of 300,000 homes a year
-
Features
Cost model: Primary care
Mark Robinson of Aecom and Marc Levinson of Murphy Philipps Architects report on how primary care is at the forefront of this challenge and how construction can respond
-
Features
Projects: The NHS’ first high-energy proton beam cancer treatment centre
The project to complete the centre, opening this summer at the Christie hospital in Manchester, was filled with a plethora of unusual challenges