Julia Barfield says thinking behind City tower project is a āmysteryā
The creator of the London Eye and Brightonās i360 has expressed bafflement at Foster + Partnersā Tulip proposals for a 305m tall tourist attraction in the Square Mile.
Marks Barfield director Julia Barfield ā who worked for Foster for the best part of a decade before starting her own practice with late husband David Marks ā said the project, drawn up for billionaire banker Jacob J Safra, did not appear to be answering a need.
Speaking at last weekās BD Live event, Barfield said the proposed structure, which features a 12-storey attraction perched on a concrete shaft a few metres from Fosterās Gherkin, appeared to borrow directly from other tall structures, including her own.
āI donāt know what Normanās doing there. Itās a mystery to me,ā she said.
āWhen we did the London Eye it was answering a need. There was no place where people could view the city from a height, unless you went up to the top of St Paulās.
āYou could say it wasnāt a desperate need, but it was providing a platform at a height so that people could see the city for the first time from a new perspective.
āNow there are three of those, with the Shard and the Walkie Talkie [as well as the Eye]. So do people really need another one? I donāt know.ā
Last week proposed for the Tulipās three āpetalsā to interfere with radar used to monitor aircraft.
A letter from the airportās technical operations coordinator said the assessment needed to be authorised āby the Local Planning Authority having consulted with London City Airport and NATS En Route Limitedā.
Fosterās Tulip scheme would deliver just under 3,000sq m of new space and has been described as a response to Safraās inability to create a visitor attraciton on the upper storeys of the Gherkin.
As well as the main tower, the planning application also includes a new entrance pavilion with public roof terrace and a dedicated education centre for the capitalās state school children.
Construction could start in 2020 and be completed in 2025, said Safra. The City of London has indicated that it plans to determine the application by March next year.
No comments yet