Work on Sheppard Robson-designed buildings to complete in 2027

Bouygues has been appointed to build two education facilities in south Wales after winning a contract worth £119m.

Cardiff and Vale College (CAVC) picked the contractor to build the Barry Waterfront Campus and the Advanced Technology Centre (ATC) in Glamorgan.

The former, which will be built on a brownfield site, will be a further education centre and vocational college accommodating up to 900 students.

Screenshot 2025-06-04 100252

Source: Sheppard Robson

The buildings have been designed by Sheppard Robson

Meanwhile, the ATC will be located at Cardiff airport and will be focused on high-tech growth sectors, with a capacity for 2,000 students.

The buildings have been designed by Sheppard Robson. 

>> Read more: Profit at Bouygues’ construction arm slips, annual results show

Work on site is expected to begin in June 2025, with completion expected in mid-2027.